So many people has this upper respiratory infection thing going on. My problem was I did not take a day or two to rest and finally I got so bad it put me to bed for 4 days.
Prior to trying to get the bed off of my back we did get some work done on the pole barn. I helped Papa Bear with this wall framing and that was it. He has another wall up on the opposite side which I don't have a picture of yet. He wanted that one wall built to help stiffen things up.
We are going to have to go ahead and start on the second floor framing in order to be able to reach the top or else build some very tall scaffolding.
He got one side ready for the siding. We will get that wall framed in after the siding goes up here.
What a blessing this was. This entire load of wood was free! Stepson is painting some new homes being built at the golf course. They were throwing away all of this lumber left over from the job so we took the trailer out and loaded up. It was about as much lumber as we had ordered and paid for! It is no wonder houses are so overpriced. We were told there was about 3 times this much but others had claimed it before we got there.
About 10 days ago I started giving the puppies some food soaked in warm water. They dug into it like little pigs!
This is a photo I took yesterday. They have gotten much bigger. They are so fun to watch as they are running around and playing now. Papa Bear has taken a liking to one of the little black ones so I imagine she may be staying. He calls her Mean Girl cause she barks and growls...hahahaha so I named her Lindsay...you know as in Lindsay Lohan from Mean Girls. Hope I haven't scarred her for life! So I will probably only have to find a home for 2 of them. Two of the little white ones are already spoken for by family members so I will get to see those two grow up!
Almost all of my little seedlings died in the greenhouse. I forgot to ask Papa Bear to keep an eye on them for water needs. I am waiting for the next almanac planting day for above ground crops to restart more. The almanac says the 22nd and 23rd are for root crops. If I am able I may start on the potatoes tomorrow. I crawled around in the Eden garden today and plucked weeds that had sprung up from the hay I had spread. I can't wait until it is a foot deep in wood chips! I hope all of you who are sick with this mess is feeling better soon. I'm praying that it passes quickly. I have a lot to do!
All about life and it's challenges on our little homestead built on a sand hill!
Showing posts with label pole barn. Show all posts
Showing posts with label pole barn. Show all posts
Tuesday, January 21, 2014
Sunday, November 24, 2013
Finally....a real barn!
We have lots of outbuildings on our property that we built as we needed something. A chicken coop, a turkey pen and shelter, several goat shelters, a birthing area for new does, a milking area and a food storage area but we have never had a real big barn. We finally decided to invest in one. What was so scary; the day it was started was the day the government shut down. I wondered if we should be spending that much money. All kinds of what ifs ran through my mind. What "if" this was it and it was going to be a shtf situation and our funds would be very low but the Lord gave me peace about it and I am now enjoying each step that is being accomplished.
The first day all of the holes were dug. I would love to have this piece of equipment to dig fence post!
While one fellow dug the holes, the other two drilled holes in the bottom of each 8 x 8 post and drove in rebar.
After the holes were dug, nothing more could happen until the building inspector could come out. Would you believe it was just to look in the holes to make sure there was no water????
Next was placing all of the 8 x 8 post and concreting them in the ground.
This crew was quick and efficient and it only took a few hours to accomplish setting all of the poles and for them to begin placing the trusses.
Once the trusses were bolted in place, the rafters were installed. The barn is 48 x 36. The eaves on the side are 14 feet and the center rises to about 20 feet. This height will eventually hold a loft. I cannot wait for all of this storage space!
The metal roofing went on next.
All the roof now completed.
Papa Bear thought his was a nice picture of it standing behind palms and Goldenrod.
We came to a standstill about 3 weeks due to not being able to find anyone to come out and give an estimate for concrete. We want 720 square feet poured for a workshop, a milk and honey room and a feed storage room. I used the yellow pages and set up an appointment with two companies. They never showed up. My neighbor found a sign for concrete work about 4 miles from us. He did come out and left an estimate on the gate post late one night. He must have been ashamed as I knew he was much too high. We could have had the entire barn poured for what he wanted for the 720 sq ft. Papa Bear and I were beginning to think we would just build wood floors.
I finally thought to place an ad on Craig's list. I figured if someone was out of work we could give them a job to do. I made sure to tell them how far from town we were so I figured we'd get only serious offers. My ad wasn't even up 20 minutes before I started getting calls. The one young fellow and his two buddies we finally decided on was just trying to make a living....not a killing.
They started to work on it this past Tuesday afternoon. The first day was leveling out the area.
The next day they started digging the footers and placing the forms.
The ground was then treated for termites.
Papa Bear inspecting the work!
The little orange thing is called a chair that holds the rebar in place inside the footers. Papa Bear said they used to use bricks but the building codes do not allow that any longer. Seems to me the bricks would have been stronger than these little plastic pieces.
See that little white spot? That is the drain that was installed for my milk and honey room.
Friday the concrete trucks arrived for the pour!
What a beautiful sight this was!
These 3 young men worked at this all day Friday. The weather did not cooperate. No sunshine at all after the concrete was poured so it was taking longer to set.
By late afternoon it was drying enough to start the final touches of smoothing it out.
Here is my drain for the milk and honey room....all concreted in! It has a thick paper coating over the top that is removed once the concrete dries. This prevented concrete from going into the drain during the pour.
All complete with wall anchors in place. Now we wait for it to dry so we can start forming the walls.
Stay tuned!
The first day all of the holes were dug. I would love to have this piece of equipment to dig fence post!
After the holes were dug, nothing more could happen until the building inspector could come out. Would you believe it was just to look in the holes to make sure there was no water????
This crew was quick and efficient and it only took a few hours to accomplish setting all of the poles and for them to begin placing the trusses.
Once the trusses were bolted in place, the rafters were installed. The barn is 48 x 36. The eaves on the side are 14 feet and the center rises to about 20 feet. This height will eventually hold a loft. I cannot wait for all of this storage space!
The metal roofing went on next.
All the roof now completed.
Papa Bear thought his was a nice picture of it standing behind palms and Goldenrod.
We came to a standstill about 3 weeks due to not being able to find anyone to come out and give an estimate for concrete. We want 720 square feet poured for a workshop, a milk and honey room and a feed storage room. I used the yellow pages and set up an appointment with two companies. They never showed up. My neighbor found a sign for concrete work about 4 miles from us. He did come out and left an estimate on the gate post late one night. He must have been ashamed as I knew he was much too high. We could have had the entire barn poured for what he wanted for the 720 sq ft. Papa Bear and I were beginning to think we would just build wood floors.
I finally thought to place an ad on Craig's list. I figured if someone was out of work we could give them a job to do. I made sure to tell them how far from town we were so I figured we'd get only serious offers. My ad wasn't even up 20 minutes before I started getting calls. The one young fellow and his two buddies we finally decided on was just trying to make a living....not a killing.
They started to work on it this past Tuesday afternoon. The first day was leveling out the area.
The next day they started digging the footers and placing the forms.
The ground was then treated for termites.
Papa Bear inspecting the work!
The little orange thing is called a chair that holds the rebar in place inside the footers. Papa Bear said they used to use bricks but the building codes do not allow that any longer. Seems to me the bricks would have been stronger than these little plastic pieces.
See that little white spot? That is the drain that was installed for my milk and honey room.
Friday the concrete trucks arrived for the pour!
What a beautiful sight this was!
These 3 young men worked at this all day Friday. The weather did not cooperate. No sunshine at all after the concrete was poured so it was taking longer to set.
By late afternoon it was drying enough to start the final touches of smoothing it out.
Here is my drain for the milk and honey room....all concreted in! It has a thick paper coating over the top that is removed once the concrete dries. This prevented concrete from going into the drain during the pour.
All complete with wall anchors in place. Now we wait for it to dry so we can start forming the walls.
Stay tuned!